PLANNING OF PHOTOVOLTAIC AND PLN HYBRID SYSTEM IN BANGKA BELITUNG UNIVERSITY

  • Muhammad Ali Raja Siregar Jurusan Teknik Elektro Fakultas Teknik, Universitas Bangka Belitung
  • Wahri Sunanda Jurusan Teknik Elektro Fakultas Teknik, Universitas Bangka Belitung
  • Ghiri Basuki Putra Jurusan Teknik Elektro Fakultas Teknik, Universitas Bangka Belitung

Abstract

Electricity at Universitas Bangka Belitung is currently supplied by the Bangka Belitung Region PLN with a power supply of 690 kVA to meet electrical energy needs. This study analyzes the hybrid photovoltaic-PLN pattern in UBB to find out more economical systems. The calculation result of the more economical hybrid pattern is the pattern with the distribution of PLN's load of 70% -30% PLTS which results in a Net Present Cost (NPC) value of US $ 1,071 M and a Cost Of Energy (COE) of US $  0.107.

Keywords: Hybrid, PLN, PLTS, NPC, COE

Downloads

Download data is not yet available.

References

Universitas Bangka Belitung (2019). Data Akademik. Kepulauan Bangka Belitung.

PT PLN Area Bangka (2018). Data Kelistrikan Universitas Bangka Belitung. Kepulauan Bangka Belitung.

Sunanda, W. (2017). Profil Beban pada Sistem Kelistrikan Universitas Bangka Belitung. Jurnal Ecotipe Vol.4 No.1, hal.1-6.

Tiandho, Y., Dinata, I., Sunanda, W., Gusa, R. F., & Novitasari, D. (2019). Solar Energy Potential in Bangka Belitung Islands, Indonesia. In IOP Conference Series: Earth and Environmental Science (Vol. 257, No. 1, p. 012022). IOP Publishing

Stasiun Meteorologi Pangkalpinang (2016). Data Rata-Rata Suhu Bulanan Pangkalpinang. Kepulauan Bangka Belitung.

Sunanda, W., Gusa, R.F., (2016). Analisis Peluang Penghematan Ekonomi Sistem Fotovoltaik Terhubung Jaringan Listrik pada Kawasan Perumahan di Kota Pangkalpinang. PROSIDING SEMINAR NASIONAL AVOER 8 Fakultas Teknik Universitas Sriwijaya.

Dedisukma, D., Sunanda, W., & Gusa, R. F. (2015). Pemodelan Sistem Pembangkit Listrik Hybrid Diesel Generator dan Photovoltaic Array Menggunakan Perangkat Lunak Homer (Studi Kasus di Pulau Semujur Kabupaten Bangka Tengah). Jurnal Ecotipe (Electronic, Control, Telecommunication, Information, and Power Engineering), 2(2), 10-17

Sunanda, W. (2017). Desain Sistem Pembangkit Listrik Tenaga Hybrid Microhydro PV Array di Dusun Sadap Bangka Tengah. Jurnal Arus Elektro Indonesia, 2(3).

Published
2019-10-03
Abstract viewed = 131 times
PDF (Bahasa Indonesia) downloaded = 98 times