ANALISA PECAH BEBAN PENYULANG KB5 DI PLN RAYON KOBA UNTUK PERBAIKAN TEGANGAN DAN SUSUT

  • Wahyu Belfias Eka Putra Daya Jurusan Teknik Elektro, Fakultas Teknik, Universitas Bangka Belitung
  • Asmar Asmar Jurusan Teknik Elektro, Fakultas Teknik, Universitas Bangka Belitung
  • Tri Hendrawan Jurusan Teknik Elektro, Fakultas Teknik, Universitas Bangka Belitung

Abstract

The problem that PLN is facing today is the high number of voltage losses that exceed the standard. Dividing the load on a buffer by constructing a new buffer is one solution to increase the stress, whereas to determine the location of the load-breaking can be used ETAP application by including the necessary parameters such as channel resistance, channel length and repeater load and each substation, on Simulation of ETAP application with Existing data, end tension on KB5 is 17 kV it is not in accordance with PLN setandar minimum 5% from 20 kV that is 19 kV, It is necessary to construct a buffer for the KB5 repeater burden for the development plan made 3 conditions for the best rise in voltage, in the first condition will be built up the network until the village Perlang voltage that can be on KB5 is 19.0 kV and voltage At KB6 that is 19,4 kV, second condition in builder penyulang to Lubuk village stress at KB 5 that is equal to 19,3 kV and voltage at KB6 that is 19,1 kV, in third condition built network until Kulur village voltage at KB5 that is 18, 8 kV while the voltage at KB6 is 19.7 kV, then the conclusion is that the first condition is the best condition for the construction plan of burden burst

Downloads

Download data is not yet available.
Published
2018-09-27
Abstract viewed = 852 times
pdf (Bahasa Indonesia) downloaded = 801 times