[1]
2020. Kajian Teknis Alat Gali-Muat dan Alat Angkut Pada Pencapaian Pengupasan Overburden 1.120.000 BCM di Pit Taman Tambang Air Laya Bulan September 2016 PT Bukit Asam (Persero) Tbk: Tecnical Study Trencher-Load Transport and Conveyance at 1,120,000 BCM of Overburden Stripping Achievement in Pit Taman Tambang Air laya September 2016 PT Bukit Asam (Persero) Tbk. MINERAL. 3, 1 (Jan. 2020), 66–73. DOI:https://doi.org/10.33019/mineral.v3i1.1578.