(1)
Perencanaan Kebutuhan Alat Gali-Muat Dan Angkut Dengan Kapasitas Ore Getting 200 M3 Jam Pada Rencana Penambangan PT Timah (Persero) Tbk: Requirement Plan of Load and Haul Equipment Withthe Capacity of Ore Getting 200 M3 Hr on Mine Plan at PT Timah (Persero) Tbk. mineral 2020, 3 (1), 74-82. https://doi.org/10.33019/mineral.v3i1.1579.