Evaluasi Kemiringan Jalan Tambang Terhadap Cycle Time Alat Angkut Pada Dump Truck Hino FG 235 JJ Tambang Batu Granit Di PT Aditya Buana Inter Kabupaten Bangka: Grade Evaluation Of The Mine Road Towards Cycle Time Of Hino FG 235 JJ Dump Truck On The Granite Mine At PT Aditya Buana Inter Bangka Regency. MINERAL, [S. l.], v. 8, n. 1, p. 14–20, 2023. DOI: 10.33019/mineral.v8i1.4094. Disponível em: https://journal.ubb.ac.id/index.php/mineral/article/view/4094. Acesso em: 13 apr. 2026.