“Kajian Teknis Alat Gali-Muat Dan Alat Angkut Pada Pencapaian Pengupasan Overburden 1.120.000 BCM Di Pit Taman Tambang Air Laya Bulan September 2016 PT Bukit Asam (Persero) Tbk: Tecnical Study Trencher-Load Transport and Conveyance at 1,120,000 BCM of Overburden Stripping Achievement in Pit Taman Tambang Air Laya September 2016 PT Bukit Asam (Persero) Tbk”. 2020. MINERAL 3 (1): 66-73. https://doi.org/10.33019/mineral.v3i1.1578.