“Perencanaan Kebutuhan Alat Gali-Muat dan Angkut dengan Kapasitas Ore Getting 200 m3/jam pada Rencana Penambangan PT Timah (Persero) Tbk: Requirement Plan of Load and Haul Equipment Withthe Capacity of Ore Getting 200 m3/hr on Mine Plan at PT Timah (Persero) Tbk” (2020) MINERAL, 3(1), pp. 74–82. doi:10.33019/mineral.v3i1.1579.