“Optimalisasi Waktu Hambatan Excavator Untuk Mencapai Target Produksi Batubara Pit C CV Kutai Kumala Energy: Optimization Losstime of Excavator to Achieve Coal Production Target at Pit C CV Kutai Kumala Energy” (2024) MINERAL, 9(1), pp. 1–8. doi:10.33019/mineral.v9i1.4677.