[1]
“Perencanaan Kebutuhan Alat Gali-Muat dan Angkut dengan Kapasitas Ore Getting 200 m3/jam pada Rencana Penambangan PT Timah (Persero) Tbk: Requirement Plan of Load and Haul Equipment Withthe Capacity of Ore Getting 200 m3/hr on Mine Plan at PT Timah (Persero) Tbk”, mineral, vol. 3, no. 1, pp. 74–82, Jan. 2020, doi: 10.33019/mineral.v3i1.1579.