“Perencanaan Kebutuhan Alat Gali-Muat Dan Angkut Dengan Kapasitas Ore Getting 200 M3 Jam Pada Rencana Penambangan PT Timah (Persero) Tbk: Requirement Plan of Load and Haul Equipment Withthe Capacity of Ore Getting 200 M3 Hr on Mine Plan at PT Timah (Persero) Tbk”. MINERAL, vol. 3, no. 1, Jan. 2020, pp. 74-82, https://doi.org/10.33019/mineral.v3i1.1579.