Technical Study Of Mine Dewatering System In Coal Mining

  • A.A Inung Arie Adnyano Prodi Teknik Pertambangan, Institut Teknologi Nasional Yogyakarta
  • Muhammad Bagaskoro Prodi Teknik Pertambangan, Institut Teknologi Nasional Yogyakarta

Abstract

Coal mining by PT. Tambang Bukit Tambi uses an open pit mining system where one of the factors that can affect mining is water that entering the mining area, so water control must be carried out, one of the ways is by using mine dewatering system. The purpose of this study is 1) To know the debit of water entering the mining area. 2) To design a pumping plan 3) To create an ideal sump design for handling water that entering the mining area. Based on the research, the daily discharge is 32,243.36 m3 / day where the water discharge that can be released by 2  Kenflo XA 125 / 40B pumps is 640 m3 / hour in 50.38 hours and the water control effort is made a sump that must accommodate water amounting to 19,427.26 m3 and after the calculation is obtained a trapezoid-shaped sump design with size length and surface width of 63.7 m, length and width of the base of the sum of 60.9 m and depth of 5 meters.

Keywords: Coal, Dewatering, Mining, Water

Downloads

Download data is not yet available.
Published
2020-07-13
How to Cite
Adnyano, A. I., & Bagaskoro, M. (2020). Technical Study Of Mine Dewatering System In Coal Mining. PROMINE, 8(1), 28-33. https://doi.org/10.33019/promine.v8i1.1794
Section
Articles
Abstract viewed = 1058 times
pdf downloaded = 3125 times