ANALYSIS OF FACTORS THAT INFLUENCE ON COST INCREASE DURING PROJECT IMPLEMENTATION DURING THE COVID-19 PANDEMIC ON SMALL SCALE CONSTRUCTION SERVICES IN BALI

  • Ida Ayu Cri Vinantya Laksmi Universitas Warmadewa
  • I Wayan Jawat
  • Ni Komang Armaeni

Abstract

The Covid-19 virus pandemic that hit Indonesia, especially Bali, had a huge impact on people's lives. This has an impact on several sectors, ranging from the health sector, the economy, education, tourism, including the development sector. The Corona outbreak has forced all countries to revise the development plans that have been proclaimed. Targets were realistically adjusted, assumptions were changed according to current circumstances, and short-term program priorities were shifted largely to address the Covid-19 pandemic. In the context of accelerating development to restore economic conditions, several small-scale construction service actors are still able to carry out development even though they have to experience several obstacles. During the implementation of development during a pandemic, of course, some costs undergo significant changes that can even cause cost overruns. The swelling of construction project costs is highly dependent on several factors, both internal and external factors of the project. Several factors were very influential in cost overruns during the implementation of projects carried out by small-scale construction service actors during the Covid-19 pandemic, including inaccurate cost estimates (9.33%), errors in choosing work methods (8.84%) ), low labor productivity (8.15%), dimensional error/measurement of work in progress (8.14%), frequent work delays (8.04%), schedule delays due to weather effects (8.00%), an increase in material prices (7.94%), high equipment prices/rents (7.67%), delays/lack of materials and materials (7.31%), material damage (6.81%), material specifications required unsuitable (6.52%), and untimely payment methods (6.26%).

Keywords: covid-19, cost overruns, project, constructions

Downloads

Download data is not yet available.

References

Asja, M. A. (2013). Pengantar Penggunaan AHP (Analytical Hierarchy Process) dalam Pengambilan Keputusan. Retrieved December 14, 2017, from http://mawardisyana.blogspot.co.id/2013/04/pengantar-penggunaan-ahp-analytical.html

Bima Risandi, Masimin, & Anita Rauzana. (2017). Analisis Faktor-Faktor Pembengkakan Biaya (Cost Overrun) Yang Berpengaruh Terhadap Ketidakpastian Biaya (Contingency Cost) Pada Proyek Irigasi Di Kabupaten Aceh BesaR. Jurnal Teknik Sipil Universitas Syiah Kuala Volume 1 Special Issue, Nomor 2, 317-328.

Deri Afriza Saputra, Rian Tri Komara Iriana, & Mardani Sebayang. (2018). Analisis Faktor Dominan Penyebab Terjadinya Pembengkakan Biaya (Cost Overrun) Pada Proyek Konstruksi Gedung Pemerintah Di Kota Pekanbaru. Jurnal Online Mahasiswa FTEKNIK Volume 5 No.1, 1-8.

Fahadila, F. (2017). Kajian Faktor Penyebab Cost Overrun Pada Proyek Konstruksi Gedung. Jurnal Teknik Mesin (JTM) Vol 6, No 2, 94-101.

Gray, C. F., & Larson, E. W. (2006). Project Management : The Managerial Process 3th Edition. Yogyakarta: Andi Offset.

Husen, A. (2011). Manajemen Proyek. Yogyakarta: Andi Offset.

Jason, C., & Waty, M. (2021). Identifikasi Faktor Penyebab Cost Overrun (Pembengkakan Biaya) Pada Proyek Rumah Tinggal. JMTS: Jurnal Mitra Teknik Sipil, Vol. 4, No. 3, 633-640.

Laksmi, I. A. (2019). Faktor Sukses Penerbitan IMB di Kabupaten Gianyar, Bali. Jurnal Spektran Vol. 7, No 2, 195-203.

Monica Tanskanovia Magna, Widi Hartono, & Sugiyarto. (2017). Analisis Risiko Konstruksi Struktur Bore Pile Pada Proyek Dengan Metode Analytical Hierarchy Process (AHP). Jurnal MATRIKS TEKNIK SIPIL, 598-604.

Muhyiddin. (2020). Covid-19, New Normal dan Perencanaan Pembangunan di Indonesia. The Indonesian Journal of Development Planning.

Nurhayati. (2010). Manajemen Proyek. Yogyakarta: Graha Ilmu.

Pandey, Raymond D, & et al. (2012). Analisis Faktor Penyebab Pembengkakan Biaya (Cost Overrun) Peralatan Pada Proyek Konstruksi Dermaga Di Sulawesi Utara. Jurnal Ilmiah Media Engineering, vol. 2, no. 3, 2012, 153-162.

Saaty, T. L. (1993). Pengambilan Keputusan Bagi Para Pemimpin, Proses. Hirarki Analitik untuk Pengambilan Keputusan dalam Situasi yang Kompleks. Jakarta: Pustaka Binama Pressindo.

Sahusilawane, T., Bisri , M., & Rachmansyah, A. (2012). Analisis Faktor-Faktor Penyebab Terjadinya Pembengkakan Biaya (Cost Overrun) pada Proyek Konstruksi Gedung di Kota Ambon. Rekayasa Sipil, [S.l.], v. 5, n. 2, 118-128.

Sari, M. M., Hadi, T. S., & Aldiansyah. (2020). Faktor Penyebab Pembengkakan Biaya Yang Berpengaruh Terhadap Biaya Akhir Pada Proyek Konstruksi Gedung. Jurnal Infrastruktur 6 (1), 59-67.

Sean A.M.Pebakirang, Agung Sutrisno, & Johan Neyland. (2017). Penerapan Metode Ahp (Analytical Hierarchy Process) Untuk Pemilihan Supplier Suku Cadang Di Pltd Bitung. Jurnal Online Poros Teknik Mesin Volume 6 Nomor 1 , 32-44.

Soeharto, I. (1997). Manajemen Proyek. Jakarta: Erlangga.

Sumadi, I. E., Wiranata, A., & Asmara, A. A. (2016). Analisis Faktor Yang Mempengaruhi Pebengkakan Biaya Konstruksi (Cost Overrun) Dengan Metode Analytical Hierarchy Process (AHP) Pada Proyek Konstruksi Di Kota Denpasar dan Kabupaten Badung. Jurnal Ilmiah Teknik Sipil · A Scientific Journal Of Civil Engineering Vol. 20 No. 1  Januari 2016, 66-71.

Yasa, A. (2020, Juni 14). Ekonomi Bisnis. Diambil kembali dari Bisnis.com: https://ekonomi.bisnis.com/read/20200614/45/1252557/dampak-corona-strategi-pembangunan-infrastruktur-perlu-penyesuaian

Published
2022-08-26
How to Cite
Laksmi, I. A., Jawat, I., & Armaeni, N. (2022). ANALYSIS OF FACTORS THAT INFLUENCE ON COST INCREASE DURING PROJECT IMPLEMENTATION DURING THE COVID-19 PANDEMIC ON SMALL SCALE CONSTRUCTION SERVICES IN BALI. FROPIL (Forum Profesional Teknik Sipil), 9(2), 78-85. https://doi.org/10.33019/fropil.v9i2.2432
Abstract viewed = 423 times
PDF (Bahasa Indonesia) downloaded = 351 times