Skip to main content
Skip to main navigation menu
Skip to site footer
Open Menu
Home
About
About the Journal
Editorial Team
Reviewer
Privacy Statement
Contact
Journal Accreditation
Current
Archives
Announcements
Submissions
Search
Register
Login
Home
/
Archives
/
Vol. 5 No. 2 (2020): MINERAL
Vol. 5 No. 2 (2020): MINERAL
DOI:
https://doi.org/10.33019/mineral.v5i2
Published:
2020-10-30
Articles
Kajian Produksi Ball Mill Dalam Menentukan Efektivitas Penggerusan Bijih Timah Primer Di CV Persada Tambang Intitama TK 4.218 Paku Kabupaten Bangka Selatan
Study of Ball Mill Production in Determining the Effectiveness of Primary Tin Ore Grinding at CV Persada Tambang Intitama TK 4.218 Paku, South Bangka
Agus Cik, Mardiah Mardiah, Guskarnali Guskarnali
1-6
PDF
Pengaruh Fragmentasi Terhadap Digging Time Dan Produktivitas Excavator Liebher R9400 Pada Area Peledakan PT Dahana Site Adaro
The Effect Of Fragmentation On The Digging Time And Productivity Of Liebher R9400 Excavator At the Blasting Area Of PT Dahana site Adaro
Alex Lisendrik Nadapdap, Guskarnali Guskarnali, Haslen Oktarianty, Haslen Oktarianty
7-11
PDF
Master Plan Pit Blok Timur Tambang Batubara Di PT Artamulia Tatapratama Kabupaten Muaro Bungo Provinsi Jambi
East Coal Mine Block Pit Master Plan In PT Artamulia Tatapratama, Muaro Bungo, Jambi
Benget Harmoko Manik, Guskarnali Guskarnali, Haslen Oktarianty
12-16
PDF
Analisis Pengaruh Geometri Jalan Tambang Dari Front Penambangan ke Stockpile Terhadap Keselamatan Kerja PT Caritas Energi Indonesia Sarolangun Jambi
Analysis of the Influence of the Geometry of the Mine Road from the Mining Front to the Stockpile on Work Safety of PT Caritas Energi Indonesia Sarolangun Jambi
Rika Fitriani, Guskarnali Guskarnali, Delita Ega Andini
17-22
PDF
Kajian Teknis Geometri Peledakan Di Pit 2 Banko Barat PT Bukit Asam Tbk, Tanjung Enim, Sumatera Selatan
Technical Study Of Blasting Geometry in Pit 2 Banko Barat Bukit Asam Tbk, Tanjung Enim Sumatera Selatan
Masyeba Evans Lubis, Irvani Irvani, Haslen Oktarianty
23-28
PDF
Kajian Teknis Sistem Jaringan Ventilasi Tambang Ciurug Level 600 PT Aneka Tambang Tbk UBPE Pongkor
Technical Study of Mine Ventilation System Ciurug Level 600 PT Aneka Tambang Tbk UBPE Pongkor
Leyriesa Awdina, Irvani Irvani, Haslen Oktarianty
29-34
PDF
Language
English
Information
For Readers
For Authors
For Librarians