Skip to main content
Skip to main navigation menu
Skip to site footer
Home
About
About the Journal
Editorial Team
Reviewer
Privacy Statement
Contact
Journal Accreditation
Current
Archives
Announcements
Submissions
Search
Search
Register
Login
Home
/
Archives
/
Vol 2 No 1 (2017): MINERAL
Published:
2017-04-28
Articles
PERENCANAAN TEKNIS OPERASI PRODUKSI BIJIH TIMAH DI BLOK 3 TAMBANG BESAR 2.1 MITRA PT TIMAH (PERSERO) TBK
Technical Planning for The Operation of Tin Ore Production at Block 3 Tambang Besar2.1 Partner of PT Timah (Persero) Tbk
Awwab Hafizh, E.P.S.B Taman Tono, Anisa Indriawati
1-7
pdf
Optimalisasi dan Produktivitas Alat Gali-Muat dan Alat Angkut pada Tambang Batu Granit PT Vitrama Properti di Desa Air Mesu, Kecamatan Pangkalan Baru, Kabupaten Bangka Tengah
Optimization and Productivity of Excavator and Dump Truck in Granite Mining Activity of PT Vitrama Properti at Air Mesu Village, Pangkalan Baru Subdistrict, Central Bangka Regency
Muhamad Nasuhi, E.P.S.B Taman Tono, Guskarnali Guskarnali
8-15
pdf
Evaluasi Produktivitas Crushing Plant Untuk Pencapaian Target produksi 30.000 Ton/Bulan Batu Granit PT Mandiri Karya Makmur Di Desa Tanjung Gunung Kabupaten Bangka Tengah
Evaluation Of Crushing Plant Productivity To Meet Production 30.000 Ton/Month Of PT Mandiri Karya Makmur’s Granit Rock In Tanjung Gunung Village, Central Bangka Regency
Firmansyah Firmansyah, E.P.S.B Taman Tono, Janiar Pitulima
16-21
pdf
Analisa Pengaruh Ground Vibration terhadap Stabilitas Low Wall Blok Muara Tiga Besar Utara Pit Timur Menggunakan Software GeoStudio 2012 di PT Bukit Asam (Persero) Tbk, Kabupaten Muara Enim
Analysis of The Effect of Ground Vibration on The Stability of The Low Wall BlockNorth Muara Tiga Besar East Pit Using Software GeoStudio 2012 at PT Bukit Asam (Persero) Tbk, District of Muara Enim
Deza Pahlevi Antasari, Irvani Irvani, Anisa Indriawati
22-31
pdf
Evaluasi Produksi Kaksa Dalam Upaya Pencapaian TargetPemindahan Tanah Bulanan Sebesar 30.000 m3 DI TB.2.1 Tempilang, PT Timah (Persero) Tbk
Evaluation of Kaksa Production in Efforts of 30.000 m3 Earthmoving Monthly Target Achievementsin TB.2.1 Tempilang, PT Timah (Persero) Tbk
Pisca Ramona, Irvani Irvani, Mardiah Mardiah
32-39
pdf
Pengaruh Pengurangan Setting Time (Wait on Cement) pada Semen Tahan Api dengan Penambahan Oil Well Cement
The Effect of Reducing Setting Time (Wait on Cement) on Fire Mortar by Increasing Oil Well Cement
Bayu Rahmadika, Yayuk Apriyanti, Irvani Irvani
40-46
pdf
Submissions
About This Journal
Jurnal Mineral
E-ISSN 2620-729X
P-ISSN 2540-7708
Author Guidelines
Journal Accreditation
Editorial Team
Open Access Policy
Copyright Notice
Reviewer
Publication Ethics
Plagiarism Sceening Policy
Journal Publication Frequency
Announcements
Focus And Scope
Contact Us
Journal Template
Recommeded Tools
INDEXED ON
Visitors and Statistics
View My Stats
Information
For Readers
For Authors
For Librarians