Skip to main content
Skip to main navigation menu
Skip to site footer
Home
About
About the Journal
Editorial Team
Reviewer
Privacy Statement
Contact
Journal Accreditation
Current
Archives
Announcements
Submissions
Search
Search
Register
Login
Home
/
Archives
/
Vol 3 No 1 (2018): MINERAL
Published:
2018-04-30
Articles
KajianTeknis Pengaruh Panjang Pukulan Terhadap Recovery Pencucian Bijih Timah Menggunakan Alat Pan American Jig Skala Laboratorium Jurusan Teknik Pertambangan Universitas Bangka Belitung
Technical Study OnTheInfluence Of Stroke For Recovery Tin Ore Washing By Pan American Jig Laboratory Scale Of Mining Engineering Department Bangka Belitung University
Adiyatma Adiyatma, Janiar Pitulima, Irvani Irvani
1-7
pdf
Optimalisasi Unit Peremukan Dalam Pencapaian Target Produksi 60.000 Ton/Bulan Batu Granit pada Pt Vitrama Properti di Desa Air Mesu Kabupaten Bangka Tengah
Optimalization of Crushing Plant in Achieving The Production Target of 60.000 Tons/month Granite in PT Vitrama Properti at Air Mesu Village Central Bangka Regency
Ahmad Reza Setiawan, E.P.S.B Taman Tono, Anisa Indriawati
8-15
pdf
KajianEkonomis Perencanaan Pengeboran Dan Peledakan Antara Kemitraan Dengan PT Bukit Asam (Persero) Tbk Pada Wilayah Pit II Banko Barat Di Tanjung Enim Sumatera Selatan
Economical Study of Drilling and Blasting planning Betweeen Partnership With PT Bukit Asam (Persero) Tbk The Pit Area II Banko West at Tanjung Enim South Sematera
Amri Tampubolon, E.P.S.B Taman Tono, Anisa Indriawati
16-23
pdf
Perbandingan Perhitungan Sisa Cadangan Batu Granit Menggunakan Metode Cross Section Terhadap Metode Contour Pada PT Aditya Buana Inter Di Kabupaten Bangka
Comparison Of Calculation The Rest Reserve Of Granite Using Cross Section Method On Contour Method At PT Aditya Buana Inter In Bangka Regency
Andesta Granitio Irwan, Irvani Irvani, Guskarnali Guskarnali
24-30
pdf
nalisis Penimbunan Overburden pada Pit 3 Timur Tambang Banko Barat di PT Bukit Asam Persero (Tbk)
Analysis of Overburden’s Stockpiling on Pit Mines 3 East Banko Barat at PT Bukit Asam(Persero) Tbk
Ben Paulus Manurung1,; E.P.S.B Taman Tono
31-38
pdf
Analisa Kestabilan Lereng Menggunakan Metode Fellenius Secara Manual dan Software Slide Rocscience 6.0 (Studi Kasus : TB 1.42 Pemali PT Timah (Persero) Tbk
Analysis Slope Stability Using Fellenius Method Manually And Software Slide Rocscience 6.0 in TB 1.42 Pemali PT Timah (Persero) Tbk
Damos Tiambunan, Irvani Irvani, Ferra Fahraini
39-49
pdf
Analisis Kestabilan Lereng Tunggal Menggunakan Metode Fellenius dan Slide v.6.0 serta Lereng Keseluruhan dengan GeoStudio 2012 pada Pit I Banko Barat PT Bukit Asam (Persero) Tbk Tanjung Enim – Sumatera Selatan
Single Slope Stability Analysis using Fellenius Method and Slide v.6.0 and Overall Slope Stability with GeoStudio 2012 at Pit I Banko Barat PT Bukit Asam (Persero) Tbk Tanjung Enim –South Sumatera
Devito Wirasto Simanjuntak, Ferra Fahraini, Anisa Indriawati
50-57
pdf
Evaluasi Realiasi Bijih Timah TB 1.42 PT Timah (Persero) Tbk Di Pemali Kabupaten Bangka
Evaluation Of Tin Ore Product Realization In TB 1.42 PT Timah (Persero) Tbk Of Pemali Bangka Regency
Epi Epi, Mardiah Mardiah, Irvani Irvani
58-65
pdf
Kajian Teknis Alat Gali-Muat dan Alat Angkut Pada Pencapaian Pengupasan Overburden 1.120.000 BCM di Pit Taman Tambang Air Laya Bulan September 2016 PT Bukit Asam (Persero) Tbk
Tecnical Study Trencher-Load Transport and Conveyance at 1,120,000 BCM of Overburden Stripping Achievement in Pit Taman Tambang Air laya September 2016 PT Bukit Asam (Persero) Tbk
Irwan Edel Frudis, Mardiah Mardiah, Janiar Pitulima
66-73
pdf
Perencanaan Kebutuhan Alat Gali-Muat dan Angkut dengan Kapasitas Ore Getting 200 m3/jam pada Rencana Penambangan PT Timah (Persero) Tbk
Requirement Plan of Load and Haul Equipment Withthe Capacity of Ore Getting 200 m3/hr on Mine Plan at PT Timah (Persero) Tbk
Rajandra Nurhadi, Guskarnali Guskarnali, Irvani Irvani
74-82
pdf
Perhitungan Sumberdaya Batu Granit Pada Quarry PT Mandiri Karya Makmur Dengan Metode Cross Section dan Metode Cut And Fill
Calculation of Granit Stone Resource In Quarry PT Mandiri Karya Makmur With Cross Section And Cut And Fill Method
Zuhirmanto Zuhirmanto, Mardiah Mardiah, Irvani Irvani
83-102
pdf
Submissions
About This Journal
Jurnal Mineral
E-ISSN 2620-729X
P-ISSN 2540-7708
Author Guidelines
Journal Accreditation
Editorial Team
Open Access Policy
Copyright Notice
Reviewer
Publication Ethics
Plagiarism Sceening Policy
Journal Publication Frequency
Announcements
Focus And Scope
Contact Us
Journal Template
Recommeded Tools
INDEXED ON
Visitors and Statistics
View My Stats
Information
For Readers
For Authors
For Librarians