Vol. 8 No. 1 (2020): FROPIL (Forum Profesional Teknik Sipil)

					View Vol. 8 No. 1 (2020): FROPIL (Forum Profesional Teknik Sipil)
Published: 2020-06-29

Articles

  • DISPLACEMENT ANALYSIS OF SHEET PILE WITH TIE BEAM ON BREAKWATER CONSTRUCTION BY USING PLAXIS

    Maulana Arif
    1-8
    DOI: https://doi.org/10.33019/fropil.v8i1.1700
  • SISTEM GANJIL GENAP PADA PINTU TOL TAMBUN TERHADAP KEMACETAN LALU LINTAS DI TOL JAKARTA-CIKAMPEK

    Muhamad Fauzi Rakhman, Sri Nuryati, Anita Setyowati Srie Gunarti
    9-16
    DOI: https://doi.org/10.33019/fropil.v8i1.1704
  • PRODUKTIVITAS KERJA PEKERJA DALAM PEMASANGAN RANGKA ATAP BAJA PERUMAHAN DITINJAU DARI SEGI LABOUR UTILIZATION RATE

    Fathur Rahman Rustan, Try Sugiyarto Soeparyanto, Djordhy Wira Wira Adyaksa
    17-24
    DOI: https://doi.org/10.33019/fropil.v8i1.1719
  • STUDI NUMERIK PENGARUH JARAK DAN KONFIGURASI KELOMPOK TIANG TERHADAP DAYA DUKUNG AKSIAL TEKAN FONDASI DALAM

    Rahmat Kurniawan, Arif Rahman Hakim Sitepu, Syahidus Syuhada
    25-35
    DOI: https://doi.org/10.33019/fropil.v8i1.1720
  • ANALISIS MODEL ELEMEN HINGGA PERKUATAN LERENG MENGGUNAKAN SOIL NAILING (STUDI KASUS : LERENG DAERAH LAHAT, SUMATERA SELATAN)

    Syahidus Syuhada, Zakaria Zakaria, Rahmat Kurniawan, Erdina Tyagita Utami
    36-45
    DOI: https://doi.org/10.33019/fropil.v8i1.1721
  • IMPLEMENTASI LIFE CYCLE COST PADA GEDUNG BANK MANDIRI SYARIAH YOGYAKARTA

    Sola Fide Krisnanda
    46-55
    DOI: https://doi.org/10.33019/fropil.v8i1.1780